framework

  • Upper Framework

    Upper Framework

    Level 2 is the first scenic level of the layout and sits above the lower storage and staging yard. On leaving the storage yard, trains do a couple of loops around the helix (the lower helix) and arrive onto level 2 and eventually into the un planned station…

    Read more: Upper Framework

  • Level 1 Framework

    Level 1 Framework

    The lowest level of the layout, level 1 is to be a non scenic storage or staging yard. This level would also support the upper decks so had to be substantial. The room seemed so big at this point. Trains will come down the helix run onto the…

    Read more: Level 1 Framework